ALUDGlobal Business Transformation
← Back to workshops

Workshop · Transformation

The signature that checks nothing

Some controls stop a real error. Others only record that somebody passed through, and this session separates the two.

Duration
3 hours
Delivery
On site · Virtual
Participants
From 8 to 25 participants
Investment
Request a proposal

Investment depends on scope, number of participants and delivery mode. We prepare a proposal at no obligation.

The problem it solves

There is a signature in the corner of nearly every document that leaves a company. Most of those signatures check nothing, and the person signing knows it: nobody ever explained what they are supposed to find, what they should be comparing the document against, or what to do when something does not add up.

The control started for a concrete reason, a duplicate payment, an order nobody authorized, a client billed for less than the job, and that reason was lost over time and with the people who left. What remained was the gesture. Signing happens fast, in volume, sometimes in advance so as not to slow anyone down, and the work carries on.

The whole problem arrives on the day an error passes three approvals and leaves the building. That is when it becomes clear the organization had controls but no checking, that it had been paying the cost of the delay for years without collecting the protection, and that the conversation about accountability is now impossible because everyone signed and nobody looked.

What it covers

The session opens with the question almost nobody puts to a control: which specific error is this meant to prevent. Participants bring the controls that exist in their operation today, approvals, reconciliations, two-signature reviews, receiving checks, and put each one through that question. The ones with no clear answer get marked, and that group is usually larger than anyone expected.

Placement comes next. The same control is worth a different amount depending on where it sits: checking before the order ships costs a few minutes, checking afterwards costs a call to the client, a credit note and an awkward conversation. Through scenario analysis, the group moves controls along a process and watches the cost of the error change at each position.

The third stretch is drafting. Writing a control so the person performing it knows what to look for, what to compare it against, and what to do when a difference turns up. Participants rework their own controls on a worksheet, and the group debates the balance between what is worth automating and what needs human judgement, which is not the same in a high-volume operation as in one built on large, infrequent transactions.

The workshop closes on the two matters that decide whether a control system survives. Exceptions, which always exist and need a named authorizer and a place where they are recorded. And what the company does the first time a control catches something real, which is when the team learns whether any of this was serious. The opposite decision gets airtime too, the one almost never made deliberately: which errors are not worth controlling.

What participants learn

  • Identify the specific error each existing control is meant to prevent.
  • Analyze which of those controls are performed on paper only.
  • Design the placement of the check at the point in the process where the error is still cheap.
  • Develop the wording of a control that states what to look for, what to compare and what to do about a difference.
  • Evaluate which errors are not worth controlling because the control costs more than the error.

Agenda

  1. Which error does this control prevent, the question rarely asked
  2. Approvals that check nothing
  3. Where the check belongs inside the process
  4. Errors that surface by themselves and errors that leave the building
  5. What a control costs against what the error costs
  6. Exceptions: who authorizes them and where they are recorded
  7. Automated checks, human checks, and the balance between them
  8. What to do the first time a control catches something

What the organization leaves with

  • An inventory of live controls with the error each one prevents, or a mark showing it prevents none.
  • Two or three of the company's own controls rewritten to state what to look for and what to do about a difference.
  • A written exceptions rule: who authorizes them and where they are recorded.
  • A list of controls the company decides to retire, with the reason noted beside each.

Program details

Format
Workshop
Also available as
Intensive workshop · Corporate training day
Languages
Español · English
Includes
  • Participant workbook
  • Action plan
  • Post-training resources
Facilitation
ALUD Consulting LLC — Global Business Transformation.

Who it is for

  • Owners and managers who approve transactions they did not originate.
  • Leads of administrative and purchasing processes.
  • Supervisors who inherited controls nobody explained to them.
  • Companies that have outgrown their own procedures.

Frequently asked questions

Will the workshop increase the number of controls we run?
More often it reduces them. Part of the work is retiring controls that prevent nothing and only add steps; an operation with fewer checks, placed where they matter, catches more than one full of signatures.
Who should attend?
The people who approve and the people who perform, in the same room. With management alone, controls get redesigned on assumptions about how the work happens; with staff alone, there is no authority to change an approval.
Is this an internal audit of our controls?
No. ALUD does not audit, does not certify and does not give an opinion on whether a company's controls are sufficient. The workshop teaches the organization to examine and rewrite them; the technical judgement belongs to its accountant or external auditor.
Does it work where the same person does the work and checks it?
It does, with a caveat stated up front. In very small teams you cannot always separate doing from checking, so the session works on compensating controls rather than promising a separation the payroll does not allow.

Request a corporate proposal

Tell us the context and we will prepare a corporate proposal for the workshop, talk or program you have in mind. This is not a purchase: it is a proposal, at no obligation.

Marked fields are required.

Working this inside the organization

If this challenge will not be settled in one session, ALUD Consulting LLC works it as consulting: management consulting, human resources, strategy, organizational design, leadership development and business transformation.